Air Source Heat Pump Case Study

ASHP Case Study –

Domestic Installation –

Samsung ASHP

Samsung ASHP

Gorleston on Sea

Great Yarmouth

Schedule of proposed works:To supply and install:

16kW Samsung Air Source Heat Pump.

All electrical installation will be included that is needed to install all product safely & to comply with IEE Wiring Regulations 17th Edition.

All plumbing will be carried out to pressurised system.

We will remove all waste materials associated with the work from site prior to handover.

We will also under take the full testing & commissioning of the entire boiler installation ourselves with the up most care; we use no outside contractors & hold all the relevant MCS accreditation to install the units so that you will qualify for the RHI 7 year payment scheme.

Full demonstration will be given to yourselves on handover on how to operate and get the best of the installation along with the handover customer guide.

Removal of current Oil Central Heating Boiler included.

 

Aims of system –

Reduce Oil running cost by 40-55% (potential for 65% including Solar PV daytime Electricty)

Provide 7 year RHI revenue, Index Linked

Reduce Carbon Emissions

Provide sustainable fuel source

Enhance the benefit of free electricity from Solar Photovoltaic’s

 

Works involved in installation –

Removing current hot water cylinder and Oil boiler

Bringing heating pipes flow and return through external wall, to suitable area for Air Source Heat Pump (external)

Power Flush of existing radiator system

Installation of indirect pressurised Samsung Hot Water Cylinder

Installation of Air Source Heat Pump System

Production of MCS Certification for product and installation

Registration onto Renewable Heating Incentive Schemes with Ofgem

Energy Performance Certificate and Green Deal Assessment issued to property

 

 

Get your free quote today